Skip to content
Salesforce (System.schedule)100% Client-Side

Cron Expression for Third Friday of the Month (Salesforce)

0 0 12 ? * 6#3At 12:00 PM, on the third Friday of the month

The Salesforce cron expression "0 0 12 ? * 6#3" runs a task third friday of the month (salesforce). In Apex, schedule it with System.schedule('MyJob', '0 0 12 ? * 6#3', new MySchedulable()). Preview the next run times in your timezone, read the plain-English translation, and copy ready-to-paste snippets for Apex System.schedule, crontab, Node.js, GitHub Actions, and AWS EventBridge.

Live playground

  • Sec0
  • Min0
  • Hour12
  • DOM?
  • Month*
  • DOW6#3
  • Year—

At 12:00 PM, on the third Friday of the month

Salesforce (System.schedule) · evaluated in UTC

24-hour view

Hover a highlighted hour for precise timestamps. Showing the next 50 executions.

Upcoming runs

Timezone

Runs are simulated in the selected IANA timezone. Auto-detected from your browser on first load.

Scheduling Apex? The Salesforce cron expression builder has the full System.schedule field reference, special-character guide, and copy-paste System.schedule snippets.

Field breakdown

How each field of 0 0 12 ? * 6#3 is interpreted in the Salesforce (System.schedule) format.

Field breakdown of 0 0 12 ? * 6#3
FieldValueAllowedStatus
Seconds00-59Valid
Minute00-59Valid
Hour120-23Valid
Day of Month?1-31, L (last day), W (nearest weekday)Valid
Month*1-12 or JAN-DECValid
Day of Week6#31-7 or SUN-SAT (1 = SUN)Valid
Year1970-2099 (optional)Valid

Use “0 0 12 ? * 6#3” in real code

Copy-paste configurations for the most common schedulers, converted to each platform’s dialect where needed.

public class MySchedulable implements Schedulable {
    public void execute(SchedulableContext ctx) {
        // Your scheduled logic — often Database.executeBatch(...).
    }
}

// Fires on the schedule below, in the scheduling user's timezone:
System.schedule('My Job', '0 0 12 ? * 6#3', new MySchedulable());

Run via Anonymous Apex, a test, or a post-deploy script. The expression is evaluated in the timezone of the user who schedules the job — watch that when hours look off by a few.

Running “0 0 12 ? * 6#3” in production

The # operator in Apex: reading 6#3

0 0 12 ? * 6#3 fires at noon on the third Friday of every month, and the 6#3 carries the schedule: day-of-week 6, third occurrence — Quartz's ordinal grammar in Salesforce's dialect. The numbering is the part to check twice: Salesforce counts 1 = SUN through 7 = SAT, so Friday is 6 (Unix cron would write Friday as 5, Quartz as 6 — here Quartz and Salesforce agree). #3 selects the third Friday within the month, and the ? sits in day-of-month as the dialect requires — exactly one day field may be unconstrained. The whole expression reads: '12:00, the sixth weekday's (#3) third appearance, every month.'

The schedule's residents are the nth-weekday business calendar: third-Friday cut-offs that payroll and finance run on (options expiry anchors the third Friday in finance domains), monthly license and subscription renewals dated by policy to a specific weekday occurrence, 'monthly report, delivered Friday, third week' distribution jobs, and governance cadences — steering-committee reminders, monthly all-hands prep — pinned to a weekday-anchored monthly rhythm. Three Fridays exist in every month (even 28-day February contains exactly four of each weekday), so #3 fires twelve times a year without exception — the reliability edge that #5 lacks, and why #1-#3 are the safe ordinals for anything load-bearing.

The ordinal family in Salesforce: #, L, and the boundaries of the grammar

The operator family extends to every ordinal question a monthly-weekday calendar asks: 6#1 first Friday, 2#2 second Monday (2 = Monday here), 7#4 fourth Saturday, and the L modifier answers from the other end — 6L is the last Friday of the month, L the last day of month (this directory's Salesforce month-end recipe), L-2 the second-to-last day. What the grammar does not have: 'last business day' (L lands on weekends when the month ends on one — the job-side weekday check remains necessary), holidays, and org-specific calendars; those stay in Apex code, where a Calendar check inside execute() extends the schedule's precision the same way Unix guard jobs do.

Operational notes for the Apex wrapper: System.schedule('ThirdFriday', '0 0 12 ? * 6#3', new ReportSchedulable()) registers the job under its name — rescheduling with the same name replaces (the idempotent-deploy pattern), and the CronTrigger record exposes NextFireTime for the definitive 'when does it run next' query. Noon (12 in the hour field — Salesforce clock times are 24-hour as everywhere) is deliberate for these workloads: distribution and reminder jobs land midday org-time-adjacent rather than at the GMT-midnight herd. The simulator above validates the six fields including the # syntax, and this directory's Salesforce hub carries the full special-character reference for the L/W/# family.

Frequently asked questions

What does the cron expression "0 0 12 ? * 6#3" mean?

"0 0 12 ? * 6#3" is a Salesforce (System.schedule) expression that means: At 12:00 PM, on the third Friday of the month. It contains 7 fields — Seconds (0), Minute (0), Hour (12), Day of Month (?), Month (*), Day of Week (6#3), Year () — and works in any scheduler that accepts the Salesforce (System.schedule) format.

How does "0 0 12 ? * 6#3" behave in UTC versus local time?

System.schedule evaluates the cron expression in the timezone of the user who schedules the job — not UTC and not necessarily the org default. Schedule as the right user (or simulate with that user's timezone above): sandbox and production users with different timezones produce different fire times, and daylight saving shifts move runs by an hour.

Is "0 0 12 ? * 6#3" valid outside Salesforce (System.schedule)?

Not directly. Standard Unix cron expects 5 fields without '?', Quartz expects a leading seconds field, AWS EventBridge appends a year and requires '?' in one of the two day fields, and Salesforce System.schedule needs a leading seconds field with 1-based weekdays and an optional trailing year. The conversion snippets below show the equivalent expression for each platform.

Why is Friday 6#3 and not 5#3 in Salesforce cron?

Salesforce numbers day-of-week 1 = SUN through 7 = SAT, making Friday the sixth day — so the third Friday is 6#3. The Unix convention (0/7 = SUN, 1 = MON ... 5 = FRI) would say 5#3, and that mismatch is the standard porting bug between Unix crontabs and Apex schedules. Quartz uses the same 1 = SUN numbering as Salesforce, so Quartz-family expressions port to Apex unchanged; Unix expressions need the numbers remapped (or day names spelled out where the context allows).

Does the third-Friday schedule ever skip a month?

Never — every month contains at least four occurrences of every weekday (28 days is exactly four weeks), so #3 always resolves: twelve fires a year, guaranteed. The fragile ordinal is #5, which exists only in months long enough to hold a fifth of that weekday (about a third of the year for any given day) and silently skips the rest. For load-bearing monthly work, #1-#3 are unconditional, #4 is safe, and #5 needs either acceptance of the skips or explicit fallback logic in the job.

About the “0 0 12 ? * 6#3” schedule

0 0 12 ? * 6#3 is the Salesforce (System.schedule) way to say “At 12:00 PM, on the third Friday of the month”. The simulator above evaluates it entirely in your browser — the timeline, the next-run table, and the timezone switcher all run client-side, so you can paste production schedules without them ever leaving your machine.

Every page in this directory follows the same structure: a plain-English translation, a per-field breakdown, platform-specific snippets, and a timezone-aware simulator. Move between the related intervals below to compare dialects, and validate one final time in the simulator with your own timezone before shipping.

Adjacent intervals and the same schedules expressed for other platforms.